Size: 9,500 sf
Cost: $3,000,000
Completed: July 2010
A new 2-bay fire station nestled in the piney forest of Spring, Texas, this 9,500 sf facility serves a fast growing community. The station sports a large kitchen and dining area, dayroom, fitness room, and three administration offices. Four dorm rooms with showers and restrooms create a home away from home environment.
Facility bones are a pre-engineered metal building with a brick and split faced CMU veneer accented with cast stone. Stained concrete runs throughout the interior with the exception of the fitness area, which has rubberized sports flooring. Porcelain tile accents the restrooms.
The apparatus bay includes trench drains, a PlymoVent system and a large high volume low speed (HVLS) fan as well as a mechanical mezzanine with enclosed data room.
Exterior features include an emergency call box for public needs, a fully landscaped lawn watered by naturally detained water on site, detention basin, communications tower and a pull through driveway.
|
 |